A heat-driven chiller can free electrical capacity—but it must reject more heat than the cooling it produces.

Contents
  1. “Heat-powered cooling” still needs a heat sink
  2. Match temperature before counting the heat
  3. Value the electrical capacity it releases
  4. Run both systems through the summer case
Illustrative single-effect absorption balance
Flow Thermal power
Useful heat supplied to chiller 1.0 MW
Cooling at assumed thermal COP 0.7 0.7 MW
Heat rejected, before auxiliary contribution 1.7 MW
Electric chiller alternative at assumed COP 5 0.14 MW electrical input for 0.7 MW cooling

“Heat-powered cooling” still needs a heat sink

An absorption chiller uses heat to drive a refrigeration cycle. That can turn engine heat into chilled water while reducing compressor-electric demand. The cooling tower or other rejection system must then dispose of both the input heat and the cooling load.

The example’s 1.7 MW rejection requirement is why a waste-heat chiller can disappoint when the tower is undersized. It is not a 0.7 MW tower simply because the cooling output is 0.7 MW.

Match temperature before counting the heat

Single-effect and double-effect absorption cycles require different driving temperatures and deliver different thermal efficiencies. Engine jacket water may suit some hot-water-driven equipment, while exhaust or steam can support higher-temperature arrangements. Require the chiller curve at the available supply/return temperatures and the design cooling-water condition.

The 0.7 COP in the example is an assumption consistent with a single-effect screening case, not a guarantee for a particular chiller. Pump and tower-fan electricity remain. Water treatment, makeup water and maintenance also belong in operating cost.

Value the electrical capacity it releases

At an assumed electric-chiller COP of 5, 0.7 MW of cooling would require 140 kW of compressor input. If that load coincides with a constrained site peak, freeing electrical capacity can be valuable as well as saving energy.

For example, 140 kW avoided over 5,000 hours at $0.10/kWh is $70,000/year before absorption-system auxiliaries. Deduct the value of heat that could have served another customer or process. “Waste” heat is not free when it has a better use.

Run both systems through the summer case

High cooling-water temperature can reduce absorption capacity at the same time site cooling demand rises. Evaluate generator output, usable heat, chiller performance and tower capacity together. Critical loads also need a plan for generator outages and low-load operation; a backup electric chiller may be part of the sensible design.

The best applications have steady simultaneous heat and cooling demand, a suitable heat grade, room for rejection equipment and a real value for released electrical capacity.