AvailableMotor / Drive package

11 Falk / Rexnord cooling-tower gear drives — surplus lot

198 HP per unit · 11 units in package · Falk / Rexnord

Request Information

History, availability and verification

Estimated dispatch
Immediate
Dispatch conditions
Available now per owner inventory update. Coordinate collection and transport; described condition still applies.
Quantity basis
Package of the linked physical assets; the package is not additional inventory.
Availability last checked
2026-09-22

Assets included in this package

This is a grouping of the assets below. Individual and package listings overlap; quantities and power must not be added together.

Package availability depends on every included asset. Confirm the final schedule before purchase.

Equipment overview

Eleven physical drives. Individual listings and the motor/drive bundle share these same assets.

Additional listing details

Listing Reference
EE-FALK-P11

Current inventory

Related equipment

AvailablePhotos pending

Package · shared assets

UK Wärtsilä two-engine package — 10 MW legacy / 11.4 MW* rehabilitation basis

Rating basis: *Conditional cylinder arithmetic: 11.4 MW. Historical reported total: 10 MW. The combined 31 MW headline is a rounded planning target, not guaranteed electrical output.

10,000 kW package total (2 units)

The listed engines can be evaluated as a combined acquisition and rehabilitation project. They are the same physical engines shown in the individual and regional package listings. Package boundaries and final balance-of-plant scope require

Project schedule

View details →

Available

Package · shared assets

Spain Wärtsilä three-engine package — 17.94 MW legacy / 20.52 MW* rehabilitation basis

Rating basis: *Conditional cylinder arithmetic: 20.52 MW. Historical reported total: 17.94 MW. The combined 31 MW headline is a rounded planning target, not guaranteed electrical output.

5,980 kW each · 17,940 kW package total (3 units)

The listed engines can be evaluated as a combined acquisition and rehabilitation project. They are the same physical engines shown in the individual and regional package listings. Package boundaries and final balance-of-plant scope require

Project schedule

View details →

Available

Package · shared assets

31 MW* Wärtsilä rehabilitation opportunity — five-engine UK + Spain package

Rating basis: *Conditional cylinder arithmetic: 31.92 MW. Historical reported total: 27.94 MW. The combined 31 MW headline is a rounded planning target, not guaranteed electrical output.

27,940 kW package total (5 units)

The listed engines can be evaluated as a combined acquisition and rehabilitation project. They are the same physical engines shown in the individual and regional package listings. Package boundaries and final balance-of-plant scope require

Project schedule

View details →