Articles

Buying decisions & power economics.

Full index

3 articles

Power Generation (3)

  • Heat derating: engines vs turbines

    Do not pay for megawatts that disappear on the hottest day—the day your load may need them most.

  • 2 MW pods: order, delivery & warranty

    The proposed pod combines two 1 MW natural-gas generator sets in a 40-foot high-cube container. The supplier’s stated package rating is 2,000 kW continuous, 480Y/277 V, three-phase, 60 Hz. It is a made-to-order program, so the next decision is whether a writte

  • 34SG rehabilitation, warranty & LTSA

    A legacy engine can support a serious power project when the rebuild, acceptance test and long-term service obligations have a clear owner.