Articles
Buying decisions & power economics.
3 articles
Power Generation (3)
- Heat derating: engines vs turbines
Do not pay for megawatts that disappear on the hottest day—the day your load may need them most.
- 2 MW pods: order, delivery & warranty
The proposed pod combines two 1 MW natural-gas generator sets in a 40-foot high-cube container. The supplier’s stated package rating is 2,000 kW continuous, 480Y/277 V, three-phase, 60 Hz. It is a made-to-order program, so the next decision is whether a writte
- 34SG rehabilitation, warranty & LTSA
A legacy engine can support a serious power project when the rebuild, acceptance test and long-term service obligations have a clear owner.