Turning generator heat into cooling with absorption chillers
Evaluate heat temperature, cooling-water demand and parasitic electricity before treating recovered heat as useful cooling.
Evaluate heat temperature, cooling-water demand and parasitic electricity before treating recovered heat as useful cooling.
Match recovered heat to moisture removal first, then evaluate the temperature and integration needs of torrefaction or pyrolysis.