AvailableTransformer package

2 × 2,600 kVA Eaton transformers — damaged repair package

2,600 kVA each · 5,200 kVA package total (2 units) · Eaton

Request Information

History, availability and verification

Estimated dispatch
Confirm dispatch timing
Photograph basis
Representative same-lot photograph.
Quantity basis
2 physical transformers; shared with individual serial listings.
Availability last checked
2026-09-22

Assets included in this package

This is a grouping of the assets below. Individual and package listings overlap; quantities and power must not be added together.

Package availability depends on every included asset. Confirm the final schedule before purchase.

Equipment overview

Two new/unused transformers with reported leaks and low oil. Repair and testing are required before energization. Individual serial listings represent the same units, not additional inventory.

Additional listing details

Listing Reference
EE-EATON-P2D

Current inventory

Related equipment

AvailablePhotos pending

Package · shared assets

UK Wärtsilä two-engine package — 10 MW legacy / 11.4 MW* rehabilitation basis

Rating basis: *Conditional cylinder arithmetic: 11.4 MW. Historical reported total: 10 MW. The combined 31 MW headline is a rounded planning target, not guaranteed electrical output.

10,000 kW package total (2 units)

The listed engines can be evaluated as a combined acquisition and rehabilitation project. They are the same physical engines shown in the individual and regional package listings. Package boundaries and final balance-of-plant scope require

Project schedule / rehabilitation

View details →

Available

Package · shared assets

Spain Wärtsilä three-engine package — 17.94 MW legacy / 20.52 MW* rehabilitation basis

Rating basis: *Conditional cylinder arithmetic: 20.52 MW. Historical reported total: 17.94 MW. The combined 31 MW headline is a rounded planning target, not guaranteed electrical output.

5,980 kW each · 17,940 kW package total (3 units)

The listed engines can be evaluated as a combined acquisition and rehabilitation project. They are the same physical engines shown in the individual and regional package listings. Package boundaries and final balance-of-plant scope require

Project schedule / rehabilitation

View details →

Available

Package · shared assets

31 MW* Wärtsilä rehabilitation opportunity — five-engine UK + Spain package

Rating basis: *Conditional cylinder arithmetic: 31.92 MW. Historical reported total: 27.94 MW. The combined 31 MW headline is a rounded planning target, not guaranteed electrical output.

27,940 kW package total (5 units)

The listed engines can be evaluated as a combined acquisition and rehabilitation project. They are the same physical engines shown in the individual and regional package listings. Package boundaries and final balance-of-plant scope require

Project schedule / rehabilitation

View details →