AvailableTransformer package

13 × 2,600 kVA Eaton FR3 copper transformers — unused package

2,600 kVA each · 33,800 kVA package total (13 units) · Eaton

Request Information

History, availability and verification

Estimated dispatch
Ready for dispatch
Photograph basis
Representative same-lot photograph.
Quantity basis
13 physical transformers; shared with individual serial listings.
Availability last checked
2026-09-22

Assets included in this package

This is a grouping of the assets below. Individual and package listings overlap; quantities and power must not be added together.

Package availability depends on every included asset. Confirm the final schedule before purchase.

Equipment overview

Thirteen reported new/unused surplus transformers; no remaining OEM warranty represented. Individual serial listings represent the same units, not additional inventory.

Additional listing details

Listing Reference
EE-EATON-P13

Current inventory

Related equipment

AvailablePhotos pending

Package · shared assets

UK Wärtsilä two-engine package — 10 MW legacy / 11.4 MW* rehabilitation basis

Rating basis: *Conditional cylinder arithmetic: 11.4 MW. Historical reported total: 10 MW. The combined 31 MW headline is a rounded planning target, not guaranteed electrical output.

10,000 kW package total (2 units)

The listed engines can be evaluated as a combined acquisition and rehabilitation project. They are the same physical engines shown in the individual and regional package listings. Package boundaries and final balance-of-plant scope require

Project schedule / rehabilitation

View details →

Available

Package · shared assets

Spain Wärtsilä three-engine package — 17.94 MW legacy / 20.52 MW* rehabilitation basis

Rating basis: *Conditional cylinder arithmetic: 20.52 MW. Historical reported total: 17.94 MW. The combined 31 MW headline is a rounded planning target, not guaranteed electrical output.

5,980 kW each · 17,940 kW package total (3 units)

The listed engines can be evaluated as a combined acquisition and rehabilitation project. They are the same physical engines shown in the individual and regional package listings. Package boundaries and final balance-of-plant scope require

Project schedule / rehabilitation

View details →

Available

Package · shared assets

31 MW* Wärtsilä rehabilitation opportunity — five-engine UK + Spain package

Rating basis: *Conditional cylinder arithmetic: 31.92 MW. Historical reported total: 27.94 MW. The combined 31 MW headline is a rounded planning target, not guaranteed electrical output.

27,940 kW package total (5 units)

The listed engines can be evaluated as a combined acquisition and rehabilitation project. They are the same physical engines shown in the individual and regional package listings. Package boundaries and final balance-of-plant scope require

Project schedule / rehabilitation

View details →