Articles
Buying decisions & power economics.
17 articles
Power Generation (3)
- Heat derating: engines vs turbines
Do not pay for megawatts that disappear on the hottest day—the day your load may need them most.
- 2 MW pods: order, delivery & warranty
The proposed pod combines two 1 MW natural-gas generator sets in a 40-foot high-cube container. The supplier’s stated package rating is 2,000 kW continuous, 480Y/277 V, three-phase, 60 Hz. It is a made-to-order program, so the next decision is whether a writte
- 34SG rehabilitation, warranty & LTSA
A legacy engine can support a serious power project when the rebuild, acceptance test and long-term service obligations have a clear owner.
Transformers & Electrical (2)
- Eaton 2,600 kVA: voltage before price
These copper-wound Eaton units become interesting after one essential check: does 34.5 kV to 416Y/240 V fit your project?
- Copper vs aluminum: the buying decision
Copper can save space today and return more metal value at retirement.
Power Economics (4)
- Metering that changes the power bill
The meter pays for itself only if its data changes a costly decision. Start with billing peaks and net generation cost.
- Flexible load: margin without losing reserve
Flexible computing can monetize spare generation. It must surrender power before it puts the main business at risk.
- LFG to RNG: where the value goes
A rich credit price does not guarantee a rich landfill-gas project. What matters is the cash left after access, processing and risk.
- 4CP: value the peaks, price the dispatch
The value is in reducing the right grid-demand intervals—not simply running a generator for a few summer hours.
Buying Equipment (3)
- How many MW can the site actually use?
Buy the megawatts your load can use—not just the number stamped on the generator.
- Packages: count the engines once
A package can simplify the purchase. It should never make the inventory look larger than it is.
- Faster power: where rehab saves time
An early engine shipment has no value if switchgear, gas or commissioning still controls the first-power date.
Heat Recovery & Cooling (2)
- Absorption cooling: the full heat balance
A heat-driven chiller can free electrical capacity—but it must reject more heat than the cooling it produces.
- Waste heat → biomass drying capacity
One tonne of wet biomass is not one tonne of product. Price the water you can remove with usable, coincident heat.
Domains & Business (3)
- Choose the right equipment-business domain
A good name saves explanation. Choose the customer, category and commercial role before shopping for the shortest address.
- Why the matching .com matters
If customers remember your name but guess the extension, who receives the visit—or the email?
- A name buyers can remember
Before a buyer reads your quote, your name has already made an impression. Make it easy to trust, remember and repeat.